Pengukuran Keandalan Alat Keruk Kapal Isap Produksi Timah 7 Menggunakan Pendekatan Overall Equipment Effectiveness (OEE)

Iqbal Fadhilsyah, Indra Feriadi, Erwansyah Erwansyah

Abstract


Production Suction Dredger (KIP) are the primary equipment for offshore tin mining, operating with a hydraulic system to drive the dredge, significantly impacting production efficiency. This study aims to measure and analyze the reliability of the dredge at KIP Timah 7 using a partial approach to the Overall Equipment Effectiveness (OEE) method, focusing on two main components: availability and performance. Data were obtained from operational reports for the 2023–2024 period, covering downtime, uptime, and monthly disruptions. The data will be processed monthly to obtain availability and performance values, then combined to calculate OEE as an indicator of work Effectiveness.  The results show that availability fluctuates between 81.30% and 100%, while performance remains constant at 100% because actual operating time meets the ideal target. The OEE value varies following changes in availability each month. The disruption analysis identified the soil pump cardan shaft, soil pump, and press pipe as the most frequently damaged components, increasing downtime. Therefore, scheduled maintenance is required on these critical components to improve work efficiency while minimizing potential production disruptions.

Keywords


avaibility; dredging equipment; equipment effectiveness; performance; reliability.

Full Text:

PDF

References


Yanto, A., Salbilla, F., & Sitakar, R. C., 2023. Implikasi resentralisasi kewenangan pertambangan timah terhadap potensi pendapatan daerah di Bangka Belitung. Jurnal Interpretasi Hukum, Vol. 4, No. 2, pp. 344-357.

Aldo, J., 2022. Analisis kegagalan struktur ladder pada kapal isap produksi. WAVE: Jurnal Ilmiah Teknologi Maritim, Vol. 16, No. 2, pp. 59-68.

Rosyidah, A. A., 2024. Analisis menurunnya kinerja main air compressor tipe jp sauer & sohn wp 81l-100 dikapal MV. Tangguh sago. Politeknik Pelayaran Surabaya.

Prakoso, A. H., 2024. Penanganan pengurangan jumlah downtime berlebih dari unit abc 1 dengan pendekatan lean maintenance pada PT. XYZ. SIGMA TEKNIKA, Vol. 7, No. 2, pp. 255-268.

Aditama, D. S., Misdiyanta, P., & Purnomo, H., 2023. Analisis produktivitas alat muat menggunakan metode overall equipment effectiveness pada kegiatan pengupasan overburden di PT. Antareja Mahada Makmur site PT. Multi Harapan Utama, Kabupaten Kutai Kartanegara, Kalimantan Timur. ReTII, Vol. 18, No. 1, pp. 1-11.

Alwi, M. R., 2024. Operasional mesin utama kapal ferry ro-ro menggunakan metode overall equipment effectiveness. Jurnal Riset Teknologi Perkapalan, Vol. 2, No. 2, pp. 1-8.

Octova, A.& Mahesa, R. T., 2017. Evaluasi produktivitas alat gali muat menggunakan metode overall equipment effectiveness pada pit utara PT. Bara Prima Pratama, jobsite Batu Ampar. Jurnal Sains dan Teknologi Keilmuwan dan Aplikasi Teknologi Industri, Vol. 21, No. 2, pp. 270-281.

Anugerah, T., Dharmawan, A., & Agusta, I., "Dampak penambangan timah laut terhadap sumber penghidupan rumah tangga nelayan di Kabupaten Kepulauan Meranti. Bhumi: Jurnal agraria dan pertanahan, 7 (1), 112–125," ed, 2021.

Lie, M. A., 2025. Analisis efektivitas mesin produksi menggunakan metode OEE pada industri makanan: Studi kasus di PT" Y". Journal of Mechanical Engineering, Vol. 2, No. 1.

Iqbal, F., 2025. Penggunaan metode Overall Equipment Effectiveness (OEE) untuk mengukur keandalan alat keruk kapal isap produksi timah 7. Politeknik Manufaktur Negeri Bangka Belitung.

Yogatama, A. W., Ibrahim, E., & Setiawan, B., 2024. Optimalisasi cadangan timah pada area bekas penambangan kapal keruk 21 singkep 1 di laut timur pulau Bangka Provinsi Kepulauan Bangka Belitung. Jurnal Geomine, Vol. 12, No. 3, pp. 244-259.

Abror, M., Lagowa, M. I., & El Hakim, M., 2024. Evaluasi kinerja jig tipe pan american terhadap recovery timah hasil pencucian bijih timah pada kapal isap produksi (kip) timah 17 di laut tempilang kabupaten Bangka Barat, Provinsi Bangka Belitung. Jurnal Teknologi Mineral dan Batubara, Vol. 20, No. 3, pp. 139-151.

Nurlita, C. M., Priatna, R., Pradesa, H. A., & Nugraha, H., 2025. Efektivitas upaya peningkatan kompetensi bidang metrologi industri tentang alat ukur di PT. Pindad. JAMBURA: Jurnal Ilmiah Manajemen dan Bisnis, Vol. 7, No. 3, pp. 1159-1166.

Harfani, E. Y., 2007. Evaluasi pengelolaan lingkungan PT. Bukit Baiduri Energi di Kalimantan Timur. program Pascasarjana Universitas Diponegoro.

Sutaarga, O.& Khoiron, M. I., 2025. Analisis pengukuran nilai Overall Equipment Effectiveness (OEE) pada mesin di PT Protech Presisi Sukses. Journal Industrial Manufacturing, Vol. 10, No. 1, pp. 37-46.




DOI: http://dx.doi.org/10.30811/teknologi.v26i1.8423

Refbacks



Copyright (c) 2026 Iqbal Fadhilsyah

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.

INDEXING AND ABSTRACTING BY:

Jurnal Teknologi - Politeknik Negeri Lhokseumawe is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License

©2021 All rights reserved | E-ISSN: 2550-0961; P-ISSN:1412-1476