Analisis Break Even Point sebagai Dasar Evaluasi Profitabilitas pada Pekerjaan Struktur Beton (Studi Kasus Pembangunan Pandawa Residence)

Made Sudiarsa, I Nengah Darma Susila, Wayan Darya Suparta, Made Budiadi

Abstract


Technological aspects play a crucial role in construction projects, particularly in selecting concrete work implementation methods. The Pandawa Residence project applies two methods for concrete structural work—site mix and ready mix—reviewed on ground floor beams and slabs. This study analyzes cost, quality, time, break-even points, and cash flow planning for both methods. The site mix method requires a cost of IDR 786,789,488.46 with a duration of 98.08 days, while the ready mix method is more economical at IDR 747,836,152.01 and faster at 95.79 days. In terms of quality, ready mix concrete performs better than site mix. The break-even point for cost occurs at a volume of 9.23 m³ with a cost of IDR 9,930,284.94, while the time break-even point is at 2.04 m³ within 0.43 hours. Cash flow analysis indicates a profit of IDR 166,618,719.86, equivalent to 16.72% of the contract value.

Keywords


Implementation Method; Site Mix; Ready Mix; Break Even Point; Cash Flow

References


Admin. 2016. Mengenal Break Even Point Proyek Konstruksi. Available: https://www.kitasipil.com/2016/09/mengenal-break-even-point-proyek.html

Budi, Ksatria. 2012. Manajemen Konstruksi. Available: https://www.ilmutekniksipil.com/pengelolaan-dan-pengendalian-proyek/manajemen-konstruksi

Deepublish, Penerbit. 2021. Pengertian Variabel Penelitian dan Jenis Jenisnya. Available: https://penerbitbukudeepublish.com/pengertian-variabel-penelitian/

Hansen, Seng. 2018. Manajemen Kontrak Konstruksi. Jakarta: PT. Gramedia Pustaka Utama.

Husen, Abrar. 2010. Manajemen Proyek. Yogyakarta: CV. Andi Offset.

Jawat, I Wayan. 2015. Metode Pelaksanaan Pekerjaan Pondasi (Studi: Proyek Fave Hotel Kartika Plaza.

Jawat, I Wayan. 2017. Metode Pelaksanaan Konstruksi Revetment.

Jaya, Dian. 2020. Mengenal Apa Itu Beton Ready Mix. Available: https://ilmuteknik.id/apa-itu-beton-ready-mix/

Pujawan, I Nyoman. 2003. Ekonomi Teknik. Surabaya: Guna Widya.

Santoso, B. G, & Chandra, J. 2006. Hubungan Over Time dengan Produktivitas Pekerjaan Pembesian (Studi Kasus pada Proyek X, Y, dan Z).

Sugiyono. 2016. Metode Penelitian Kuantitatif, Kualitatif dan R & D. Bandung: PT. Alfabet.

Zahir. 2016. Definisi Struktur dan Konstruksi Bangunan Terlengkap. Available: https://blog-mue.blogspot.com/2016/03/definisi-struktur-dan-kontruksi.htmlGangwar, P., & Tiwari, S. (2021). Stabilization of soil with waste plastic bottles. Materials Today: Proceedings, 47, 3802–3806. https://doi.org/10.1016/J.MATPR.2021.03.010




DOI: http://dx.doi.org/10.30811/portal.v18i1.8781

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Made Sudiarsa, Ketut Sutapa, Wayan Darya Suparta, Made Budiadi