Analisis Student’s Syndrome terhadap Keterlambatan Progres Pekerjaan pada Proyek Konstruksi Gedung Kampus
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Anastasiu, L., Câmpian, C., & Roman, N. (2023). Boosting construction project timeline: The case of Critical Chain Project Management (CCPM). Buildings, 13(5).
Ballard, G. (2000). The last planner system of production control (Doctoral dissertation). University of Birmingham, UK.
Elmaghraby, S. E. (2017). Activity networks: Project planning and control by network models. New York, NY: Wiley.
Ervianto, W. I. (2023). Manajemen proyek konstruksi. Yogyakarta: Penerbit Andi.
Goldratt, E. M. (1997). Critical chain. Great Barrington, MA: North River Press.
Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of Critical Chain Scheduling. Journal of Operations Management, 19(5), 559–577.
Kasiram, M. (2008). Metode penelitian kuantitatif-kualitatif. Malang: UIN Malang Press.
Khahro, S. H., Shaikh, H. H., Zainun, N. Y., Sultan, B., & Khahro, Q. H. (2023). Delay in decision-making affecting construction projects: A sustainable decision-making model for mega projects. Sustainability, 15(7).
Kerzner, H. (2018). Project management: A systems approach to planning, scheduling, and controlling (12th ed.). Hoboken, NJ: John Wiley & Sons.
Kostrzewa-Demczuk, P. (2024). Construction schedule versus various constraints and risks. Applied Sciences, 14(1).
Leach, L. P. (2014). Critical chain project management (2nd ed.). Norwood, MA: Artech House.
Nyqvist, R., Peltokorpi, A., & Seppänen, O. (2024). Uncertainty network modeling method for construction risk management. Construction Management and Economics, 42(4), 346–365.
Simanjuntak, P. J. (1985). Produktivitas tenaga kerja. Jakarta: Lembaga Penerbit Fakultas Ekonomi Universitas Indonesia.
Soehendradjati. (1990). Manajemen konstruksi bagian 1. Yogyakarta: Universitas Gadjah Mada.
Song, J., Munyinda, M., & Adu Sarfo, P. (2025). Examining the impact of risk management practices on sustainable project performance in the construction industry: The role of stakeholder engagement. Frontiers in Built Environment, 11.
Sugiyanto. (2021). Manajemen proyek rantai kritis. Jakarta: Cipta Media Nusantara.
Suranata, P., Jawat, I., Laksmi, I. A., & Dharmastika, I. G. A. (2025). Buffer time analysis in construction project scheduling with Critical Chain Project Management (CCPM) method.
Triatmadja, R., Benazir, B., Tahalele, M., Pratomo, A. N. R., & Yuwono, N. (2025). Impact of tsunamis on buildings in array layouts as macro roughness: Lessons from the 2018 Anak Krakatau event through DualSPHysics modeling. Natural Hazards, 121, 9679–9704.
Wang, S., Feng, K., & Wang, Y. (2023). Modeling performance and uncertainty of construction planning under deep uncertainty: A prediction interval approach. Buildings, 13(1).
Zhang, L., He, J., & Zhou, S. (2022). Behavioral factors influencing construction project delays: Evidence from developing countries. Journal of Construction Engineering and Management, 148(3).
DOI: http://dx.doi.org/10.30811/portal.v17i2.8590
Refbacks
- There are currently no refbacks.
Copyright (c) 2025 Reiza Wahyu Rahmadani, Lusiana Lusiana, Lusiana Lusiana, Rafie Rafie, Rafie Rafie