Quantity Take-off Using Building Information Modeling on Superstructure Works

Farhan Rafid Bahtiar, Siti Nurasiyah, Istiqomah Istiqomah

Abstract


Technological advancements in the construction industry have encouraged the adoption of Building Information Modeling (BIM) as a digital approach in project implementation. This study discusses the implementation of BIM in calculating work volumes (Quantity Takeoff/QTO) and project scheduling by considering labor fluctuations through resource leveling analysis. The objective of this research is to compare QTO results between BIM and conventional methods, as well as to analyze labor requirements and project duration. This research uses a case study method on the superstructure phase of a building project. The comparison results show a difference in work volumes between the BIM and conventional methods, namely 8.98% for reinforcement work, 13.23% for concrete casting, and 8.57% for formwork. Based on these findings, this study provides a quantitative overview of the differences between the conventional and BIM-based methods in terms of work volume. Further studies are recommended using more diverse case objects and a broader scope of construction work.

Keywords


Building Information Modelling; quantity take off; superstructure.

Full Text:

PDF

References


Alimin, Imron, & Taulani. (2023). Penerapan building information modeling (BIM) Autodesk Revit dalam pembuatan bar bending schedule (BBS) pondasi pile cap proyek Apartemen JKT Living Star - Jakarta Timur. Jurnal Riset Rumpun Ilmu Teknik, 2(2), 21–32. https://doi.org/10.55606/jurritek.v2i2.1599

Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors. John Wiley & Sons, Inc. https://doi.org/10.1093/nq/s7-II.32.110-e

Ferial, R., Hidayat, B., Pesela, R. C., & Daoed, D. (2022). Quantity take-off berbasis building information modeling (BIM) studi kasus: Gedung Bappeda Padang. Jurnal Rekayasa Sipil (JRS-Unand), 17(3), 228–238. https://doi.org/10.25077/jrs.17.3.228-238.2021

Laorent, D., Nugraha, P., & Budiman, J. (2019). Analisa quantity take-off dengan menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1), 1–8. https://doi.org/10.9744/duts.6.1.1-8

Marizan, Y. (2019). Studi literatur tentang penggunaan software Autodesk Revit: Studi kasus perencanaan Puskesmas Sukajadi Kota Prabumulih. Jurnal Ilmiah Beering’s, 6(1), 15–26.

Pamungkas, A. P. (2022). Analisis optimalisasi perhitungan RAB menggunakan Revit (Studi kasus pembangunan gedung Bank BRI) [Undergraduate thesis, Universitas Medan Area].

Sastraadmadja, S. A. (1984). Analisa anggaran biaya pelaksanaan. NOVA.

Utama, W. P., Peli, M., & Jumas, D. Y. (2008). Standarisasi pengukuran kuantitas pekerjaan konstruksi di Indonesia. Prosiding PPIS Bandung, 1–13.




DOI: http://dx.doi.org/10.30811/portal.v17i2.7788

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Farhan Rafid Bahtiar