Metode Pelaksanaan Penggabungan Tiang Pancang dan Kepala Tiang pada Proyek Apartemen Princeton Boutique Living di Kota Medan
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Binangkit, G. P., Setiawan, M. I., & Nasihien, R. D. (2021). Evaluation of the Implementation of Pile Installation Work for the Pier Structure Reinforcement Project Surabaya Silver Diamond. 2(1), 41–51.
Fidina Bella, A., Muhammad, C., & Sahid, N. (2023). Effect of pile foundation implementation on environment, cost of elevated railway line Construction project between solo balapan-kadipiro KM 104+700 to KM 107+000 (Phase II). International Research Journal of Innovations in Engineering and Technology (IRJIET), 7(3), 132–141. https://doi.org/10.47001/IRJIET/2023.703020.
Hadi, R. R., & Yasin, N. (2023). Perhitungan volume beton pile cap pada proyek pembangunan struktur parkir (elevated) Taman Mini Indonesia Indah (TMII). UG Jurnal, 17(01), 28–44. https://ejournal.gunadarma.ac.id/index.php/ugjournal/article/viewFile/8548/2842.
Orientilize, M., Prakoso, W. A., Lase, Y., Purnomo, S., & Sumartono, I. H. (2023). Study of repaired spun pile to pile cap connections containing fractured reinforcements using frp. International Journal of GEOMATE, 25(110), 114–122. https://doi.org/10.21660/2023.110.3987.
Ramadhan, I. (2023). Development of guidelines for implementation of bored pile foundation work based on risk analysis. Eduvest - Journal of Universal Studies, 3(1), 141–153. https://doi.org/10.59188/eduvest.v3i1.722.
Tan, S.L., et al. (2010). Performance of Spun Piles in Various Soil Conditions. Journal of Geotechnical Engineering, 136(4), 456-465.
Indonusa Conblock. Pengertian dan Fungsi Pile Cap. Januari 10,2023. https://indonusaconblock.com/pengertian danfungsi-pile-cap/
Muluk, M., Hamid, D., & Santi, M. (2020). Studi Perbandingan Pondasi Tiang Pancang Dengan Pondasi Bore Pile (Studi Kasus: Pelaksanaan Pembangunan Pondasi Tower Grand Kamala Lagoon-Bekasi). Jurnal Teknik Sipil Itp, 7(1), 26–33.
Assaf, S. A., & Al-Hejji, S. (2006). Causes Of Delay In Large Construction Projects. International Journal Of Project Management, 24(4), 349–357.
Puro, S. (2006). Scoring Points: Politicians, Activists, And The Lower Federal Court Appointment Process. Perspectives On Political Science, 35(1), 54.
Alvin J.L, dkk. 2016. Produktivitas Dan Keterlambatan Produksi.
Tiang Pancang Dan Tiang Listrik Pada Perusahaan “X†Dengan MPDM. Jurnal Dimensi Pratama Teknik Sipil Vol. 5 No. 2.
Jones, P., & Smith, L. (2019). Urban Chalenges in Apartment Conctruction: A Comprehensive Review. Conctruction and Bulding, 18(3), 221-238.
Brown, R., & Clark, J. (2019). Coordination Challenges In High-Density Urban Conctruction : Insight From Apartment Projects. Construction Management Journal, 24(1), 105-120.
DOI: http://dx.doi.org/10.30811/portal.v16i3.5604
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Ridho Azahar, Pan Surya Handika, Abdulloh Abdulloh






