Analisis Nilai Labour Utilitation Rate Tenaga Kerja pada Pekerjaan Struktur Beton

M. Fatkhul Adzim, Michella Beatrix

Abstract


Labor productivity has an important role in the success of a project. A low level of productivity can result in the delay of a job, but if the level of productivity has a high value it has a positive impact on the possibility of a job being postponed. This research aims to analyze the level of labor productivity in the field using the productivity rating approach method. The results of the research are that productivity in the Phase 3 Medical Building project at Siti Khodijah Muhammadiyah Hospital Throughout-Sidoarjo is classified in the effective or satisfactory category. .02 %, and 79.53 %. The average LUR values for column, beam and plate formwork work are 80.15%, 77.69% and 77.39% respectively. The average LUR value of casting work is 80.97%.

Keywords


Productivity, Labor, Productivity Rating

References


Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, 3(2), 103–112. https://doi.org/10.35194/momen.v3i2.1207

Nugroho, A. J. (2021). TINJAUAN PRODUKTIVITAS DARI SUDUT PANDANG ERGONOMI. Partnership for Action on Community Education.

Oglesby, C.H., Parker, H.W., and Howell, G.A. (1989). Productivity Improvement in Construction. New York :McGraw-Hill.

Sandi, K. C., & Cahyono, N. (2020). ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (STUDI KASUS PROYEK REHABILITASI PASAR JOHAR KOTA SEMARANG). Jurnal Teknik Sipil Giratory Upgris, 1(1). https://doi.org/https://doi.org/10.26877/goratory.v1i1.5421

Subagyo, G. W. (2022). ANALISIS LABOUR UTILITATION RATE TENAGA KERJA ( Studi Kasus Proyek Bintaro Jaya Xchange Tahap II , Tangerang Selatan ). 5(2), 30–37.




DOI: http://dx.doi.org/10.30811/portal.v16i1.4775

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 M. Fatkhul Adzim, Michella Beatrix