Analisis Nilai Labour Utilitation Rate Tenaga Kerja pada Pekerjaan Struktur Beton
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi. Jurnal Momen Teknik Sipil, 3(2), 103–112. https://doi.org/10.35194/momen.v3i2.1207
Nugroho, A. J. (2021). TINJAUAN PRODUKTIVITAS DARI SUDUT PANDANG ERGONOMI. Partnership for Action on Community Education.
Oglesby, C.H., Parker, H.W., and Howell, G.A. (1989). Productivity Improvement in Construction. New York :McGraw-Hill.
Sandi, K. C., & Cahyono, N. (2020). ANALISIS PRODUKTIVITAS PEKERJA DENGAN METODE TIME STUDY PADA PEKERJAAN KOLOM (STUDI KASUS PROYEK REHABILITASI PASAR JOHAR KOTA SEMARANG). Jurnal Teknik Sipil Giratory Upgris, 1(1). https://doi.org/https://doi.org/10.26877/goratory.v1i1.5421
Subagyo, G. W. (2022). ANALISIS LABOUR UTILITATION RATE TENAGA KERJA ( Studi Kasus Proyek Bintaro Jaya Xchange Tahap II , Tangerang Selatan ). 5(2), 30–37.
DOI: http://dx.doi.org/10.30811/portal.v16i1.4775
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 M. Fatkhul Adzim, Michella Beatrix