Optimization Of Gas Turbine Performance 2.1 Using the Overhaul Combustion Inspection Method

Susilo Handoko, Hendra Hendra, Hafid Suharyadi, Totok Widiyanto

Abstract


Gas turbines are one type of internal combustion drive, the initial mover utilizes gas combustion as a fluid to rotate the turbine with internal combustion. Gas turbines at private companies producing electricity use the initial movers, namely gas turbines and steam turbines. Therefore, it is also called the "Steam Gas Power Plant/PLTGU.â€Private company especially in Block 2, uses two gas turbine units with Mitsubishi GT 2.1 specifications which are used as the initial drive of the generator. Types of overhauls in gas turbines are divided into three, including turbine inspection, combustor inspection, and major inspection. In maintaining the reliability of the GT 2.1 Gas Turbine, an overhaul combustion inspection was carried out in the combustion chamber because there was an increase in heat rate of 17,9% which caused a decrease in thermal efficiency and net turbine power of the GT 2.1 Gas Turbine by 17% and 2,1%. So that steps are taken to optimize the GT 2.1 Gas Turbine with the combustion inspection method by repairing and cleaning the combustion bucket nozzle. Increased thermal efficiency by 27,8% or 27,13% to 36,01% from data before overhaul. This was also followed by an increase in compressor power and turbine power so that the net turbine power increased by 38% or 141339,35 hp to 195246,54 hp.

 


Keywords


gasturbine, combustion inspection, thermal efficiency, turbine power.

Full Text:

PDF

References


A. F. El-Sayed, “Aircraft Propulsion and Gas Turbine Engines, Second Edition.â€

Arthur H. Lefebvre and Dilip R. Ballal, “GAS Turbine Combustion Third Edition Alterna-tive Fuels and Emissions,†2010.

P. U. M. Karang, Parts Catalouge Mitsubishi Gas Turbine M701F. Jakarta: Mitsubishi, 2009.

S. S. Baakeem, J. Orfi, and H. Al-Ansary, “Performance improvement of gas turbine power plants by utilizing turbine inlet air-cooling (TIAC) technologies in Riyadh, Saudi Arabia,†Appl Therm Eng, vol. 138, pp. 417–432, 2018

R. Kurz and K. Brun, “Gas Turbine Perfor-mance and Maintenance,†Engineering, Envi-ronmental Science, 2012. [Online].

F. L. Arvidsson and K. T. E. Thoren, “Operat-ing Experience with Large Industrial Utility Gas Turbines,†THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS, UNITED ENGINEERING CENTER, 345 EAST 47th STREET, NEW YORK, N.Y. 10017, Jan. 1970, [Online].

J. An and L. Zhao, “Repair Strategy Optimi-zation for Gas Turbine Based on Equivalent Operating Hour (EOH) Analysis,†School of Management, China University of Mining &Technology (Beijing), Bejing, 100083, Chi-na , 2012.

W. A. Sirignano and F. Liu, “Performance Increases for Gas-Turbine Engines Through Combustion Inside the Turbine,†J Propuls Power, vol. 15, no. 1, Jan. 1999.

Q. Kang, R. Dewil, J. Degrève, J. Baeyens, and H. Zhang, “Energy analysis of a particle suspension solar combined cycle power plant,†Energy Convers Manag, vol. 163, pp. 292–303, 2018

T. K. Ibrahim et al., “Thermal performance of gas turbine power plant based on exergy analysis,†Appl Therm Eng, vol. 115, pp. 977–985, 2017

M. Ir. Nahamudin, “Gas Turbine Theory,†Bandar Lampung, Apr. 2015.

A. Kumar Sharma, A. Singhania, A. Kumar, R. Roy, and B. Kumar Mandal, “Improvement of Gas Turbine Power Plant Performance: A Review,†2017.

R. Syammary, ; Hendri, and ; Lukfianto, “Analisis Efisiensi Turbin Gas Tipe V94.2 Sebelum dan Sesudah Minor Inspection Pada Blok 4 Unit 3 Pltgu Muara Tawar,†Jurnal Power Plant, vol. 8, no. 2, 2020

Jung Sub Lim, “Inspecting and Diagsing De-vice for Gas Turbine Combustor,†Korea Western Power EC, 2021.

W. Aris Munandar, “Pengantar turbin Gas dan Motor Propulsi,†Pengantar turbin Gas dan Motor Propulsi, 2001.

M. L. Mathur and R. P. Sharma, “Gas Tur-bines and Jet and Rocket Propulsion.â€

Jr. , W. G. James L. Lawen, “Combustion Liner for Gas Turbine Having Liner Stops,†General Electric Company, Schenectady, NY (US), 2001.

B. Becker, W. Schulten, and B. Schetter, “Combustion System Development for Dry Low- No Emission an High Temperature Tur-bine Inlet Temperatures,†1996, [Online].

Maherwan P. Boyce, “GasTurbine Engineer-ing Handbook Second Edition,†2001.

M. P. Boyce, B. Oxford, J. Melbourne, and N. Delhi, “Gas Turbine Engineering Handbook Third Edition,†2006. [Online].

Y. A. Cengel, “Steady versus Transient Heat Transfer 63 Multidimensional Heat Transfer 64 Heat Generation 66.â€

M. T. Schobeiri, “Gas Turbine Design, Com-ponents and System Design Integration.â€

R.K Rajput, “A textbook of internal combus-tion engines including air,†2015.

Bernier Maclsaac and Roy Langton, “Gas Turbine Propulsion Systems Aerospace Series List,†Canada, USA, 2011.

Ş. Balku, “Analysis of combined cycle effi-ciency by simulation and optimization,†Energy Convers Manag, vol. 148, pp. 174–183, 2017




DOI: http://dx.doi.org/10.30811/jpl.v22i1.4221

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Lisensi Creative Commons

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-BerbagiSerupa 4.0 Internasional .

 

Alamat Surat :

Politeknik Negeri Lhokseumawe
Jl. Banda Aceh-Medan Km 280
Buketrata, Lhokseumawe, 24301, Aceh, Indonesia