Optimization of the drilling campaign in reducing drilling cost in Block A Asset

Ibnu Hafizh, Hasan Yudie Sastra, Irwansyah Irwansyah

Abstract


Drilling requires large costs with a very high risk of work, therefore good and careful planning is needed before it is carried out to obtain effective and efficient results by considering two aspects i.e. engineering and economics. Unstable conditions at the drilling site pose a high risk from the investor's point of view in terms of the total drilling costs that will be incurred in the area. The Platform drilling campaign implemented in Alur Siwah Phase 1 project is part of a project to increase gas recovery so that meets the gas raw materials demand in Aceh and the campaign is conducted using directional drilling technique. A descriptive method was used in the study and the data was gathered from the drilling activity reports during planning to post-drilling. Optimization using a drilling campaign during the drilling for the three wells in Alur Siwah Fase 1 resulted in a drilling cost savings of 26% and also saved execution time about 37 days from planning time

Keywords


technical aspect, cost aspect, drilling campaign, optimization.

Full Text:

PDF

References


F. I. Khan, R. Sadiq, and T. Husain, “Risk-based process safety assessment and control measures design for offshore process facilities,” J. Hazard. Mater., vol. 94, no. 1, pp. 1–36, 2002.

H. J. Carrizo, G. Ortuno, and T. D. Neto, “Case History: Performance of a Drilling Campaign in the Santos Basin, Brazil, 2008-2010: A Success Story,” 2011.

S. Akmal, “Dinamika Politik Lokal dan Keamanan pada Proyek Eksplorasi Migas Medco Aceh Timur,” 2020.

A. G. Sugiono, “Analisis Kuantitatif Kualitatif dan R & D,” Bandung. Alf., 2015.

M. E. Hossain and A. A. Al-Majed, Fundamentals of sustainable drilling engineering. John Wiley & Sons, 2015.

A. A. N. B. Bunda, “Evaluasi Lintasan Pemboran Berarah Dengan Berbagai Metode Pada Sumur a-25 Lapangan B,” J. Petro, vol. 6, no. 4, pp. 138–142, 2017.

J. Tinoco et al., “New Drilling Campaign and New Technologies after 10 Years Without Drilling improve Performance in La Ceiba field,” 2014.

Z. Akkaoui, “Transforming well construction with autonomous direction drilling,” no. January, pp. 64–66, 2021.

M. Amin, “Dasar-Dasar Pelatihan Pengeboran,” Kementeri. Pendidik. Dan Kebud. Republik Indones., vol. 53, no. 9, pp. 1689–1699, 2019.

P. Medco E&P Malaka, “End of Well Report (Eowr) Alur Siwah 1A, 11 & 12,” 2109.

G. F. Saraswati and M. Ginting, “Analisa Waktu Yang Tidak Produktif (Npt) Pada Operasi Pemboran Sumur Lepas Pantai ‘Nb-aaa’ Lapangan Xy, Total E&p Indonesie Kalimantan Timur,” 2016




DOI: http://dx.doi.org/10.30811/jpl.v20i1.2546

Refbacks

  • There are currently no refbacks.




Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

 

  

    

    

Lisensi Creative Commons

Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi-BerbagiSerupa 4.0 Internasional .

 

Alamat Surat :

Politeknik Negeri Lhokseumawe
Jl. Banda Aceh-Medan Km 280
Buketrata, Lhokseumawe, 24301, Aceh, Indonesia