Analisis Manajemen Proyek Pembangunan Mako Polsek Gemolong dan Fasum terhadap Kinerja Mutu, Biaya dan Waktu TA 2024

Yudi Suzandi, Antonius Antonius, Kartono Wibowo

Abstract


The construction of the Gemolong Police Sector Headquarters (Mako Polsek Gemolong) and public facilities in Sragen is a state-owned project built from June 4, 2024, to October 31, 2024. This facility serves as a center for public services and complaints to the Indonesian National Police. The construction includes four detention rooms, each with a maximum capacity of five detainees. These detention rooms are not intended for permanent detention but as temporary holding cells before transfer to permanent prisons. This study assesses the effectiveness of implementing quality, cost, and time management during the construction process. The analytical method used involves comparing the implementation of quality management with the Technical Specifications, comparing the Project Implementation Budget Plan (RAP) with the contractual Budget Plan (RAB), and comparing the initial work schedule (Time Schedule) with the actual field implementation. The findings show that quality management during the construction of the Gemolong Police Headquarters and public facilities met the required technical specifications. However, cost management was deemed unsuccessful because the implementation cost reached IDR 3,625,017,095.07, exceeding the contractual value of IDR 3,414,445,000.00, resulting in the failure to achieve the expected 10% profit margin. Time management was also considered unsuccessful due to a 30-working-day delay in project completion. Based on these results, it is recommended that the Commitment-Making Officer (PPK) review the application of contractual provisions in construction projects and that relevant stakeholders pay greater attention to the implementation of quality, cost, and time management principles in future projects.

Keywords


construction management; project quality; cost performance; time schedule; Gemolong Police Headquarters.

Full Text:

PDF

References


Ali, M. M., Hariyati, T., Pratiwi, M. Y., & Afifah, S. (2022). Metodologi penelitian kuantitatif dan penerapannya dalam penelitian. Education Journal, 2(2), 1–6.

Bria, M., Muda, A. H., & Lay, Y. E. (2016). Pada proyek konstruksi. Prosiding Teknik Sipil, 114–121.

Fahirah, F., & Mustika, Y. (2022). Pengaruh penerapan keselamatan dan kesehatan kerja (K3) terhadap keberhasilan proyek konstruksi gedung bertingkat di Kota Palu. Prosiding Seminar Nasional Penelitian & Pengabdian Kepada Masyarakat (SNP2M) Ke-6, 58–63.

Mayasari, C. (2013). Pengaruh penerapan sistem manajemen mutu terhadap biaya mutu pada proyek konstruksi dermaga. Extrapolasi: Jurnal Teknik Sipil, 6(2), 42–54.

Nurdin, A. L., & Feriska, Y. W. D. (2023). Perencanaan biaya keselamatan dan kesehatan kerja (K3) pada proyek konstruksi bangunan (studi kasus di gedung kantor pemerintahan terpadu Kabupaten Brebes). Jurnal Teknik Sipil dan Konstruksi, 1(1), 66–77.*

Pangkey, F., Malingkas, G. Y., & Walangitan, D. O. R. (2012). Penerapan sistem manajemen keselamatan dan kesehatan kerja (SMK3) pada proyek konstruksi di Indonesia (studi kasus: pembangunan Jembatan Dr. Ir. Soekarno-Manado). Jurnal Ilmiah Media Engineering, 2(2), 100–113.*

Ratih, S., & Ismail, A. (2018). Analisa efektivitas waktu dan biaya proyek ditinjau dari unsur-unsur manajemen proyek (studi kasus overlay runway Bandara Internasional Soekarno-Hatta). Jurnal Konstruksi, 16(2), 23–31.* https://doi.org/10.33364/konstruksi/v.16-2.588

Rosdiana, W., & Sutardi, S. (2021). Analisis pengaruh faktor dominan terhadap kinerja kontrak pelaksanaan konstruksi jaringan transmisi dari aspek biaya, waktu, dan mutu. Indonesian Journal of Construction Engineering and Sustainable Development (CESD), 4(2), 73–84.* https://doi.org/10.25105/cesd.v4i2.10379

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis faktor-faktor penentu keberhasilan proyek konstruksi berdasarkan mutu, biaya, dan waktu. Jurnal Komposit, 7(2), 233–240.* https://doi.org/10.32832/komposit.v7i2.14240

Simanjuntak, M. R. A., & Manik, R. B. H. (2019). Kajian awal sistem manajemen pengendalian mutu dalam meningkatkan kinerja waktu proses konstruksi bangunan gedung tinggi hunian di DKI Jakarta. Prosiding Seminar Nasional Teknik Sipil, 258–264.*

Sompie, B. F., & Wauran, D. (2015). Analisis faktor keterlambatan penyelesaian proyek konstruksi gedung terhadap mutu dan biaya. Jurnal Teknik Sipil, 5(2), 401–405.*

Sudarsana, K. (2017). Pengendalian biaya dan jadual terpadu pada proyek konstruksi (integrated cost and schedule control). Jurnal Teknik Sipil, 12(2), 117–125.*

Zellatifanny, C. M., & Mudjiyanto, B. (2018). Tipe penelitian deskriptif dalam ilmu komunikasi. Diakom: Jurnal Media dan Komunikasi, 1(2), 83–90.* https://doi.org/10.17933/diakom.v1i2.2




DOI: http://dx.doi.org/10.30811/portal.v17i2.8362

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Yudi Suzandi, Antonius Antonius, Kartono Wibowo