Comparison of Time and Cost Efficiency: Conventional Scaffolding vs. Perth Construction Hire in Building Construction Projects (Case Study: Integrated Medical Education Building, Jenderal Soedirman University)

Lutfi Zukhruf Humaira, Siti Nurasiyah, Naufal Ariq Pratama

Abstract


The selection of scaffolding type is a crucial aspect in construction project execution, as it significantly affects time effectiveness and cost efficiency. This study aims to analyze the cost and time associated with the use of scaffolding and Perth Construction Hire (PCH) in the construction project of the IME Building at Jenderal Soedirman University (UNSOED), and to compare both methods in order to determine the most optimal alternative. The research employs a descriptive quantitative approach, conducted through observation and the collection of secondary data, including detailed engineering design (DED) drawings, Unit Price Analysis (AHSP), and price lists for scaffolding and PCH. The collected data were analyzed to calculate the time productivity and cost of each scaffolding method. The results indicate that PCH is more effective in terms of time, offering a saving of approximately 4 days or 20% compared to scaffolding. However, in terms of cost, scaffolding is more efficient, as the cost of using PCH is approximately 24% higher. Therefore, it can be concluded that PCH excels in time effectiveness, while scaffolding is more suitable for cost efficiency in the execution of this project.


Keywords


scaffolding; Perth Construction Hire; time; cost.

References


Andiyan, A.,et al (2023). MANAJEMEN PROYEK : Teori & Penerapannya (Issue May).

Respati, R., Wardah, S., & Akbar, R. Z. (2023). Analisis Perbandingan Biaya Penggunaan Perancah Kayu dan Penyewaan Scaffolding. Development Engineering of University Journal, 6(1), 1–10. https://journal.mbunivpress.or.id/index.php/density

Sadono, Aa. W., & Purwono, E. E. (2005). Studi Komparansi Biaya dan Waktu Pelaksanaan Antara Perancah Bambu dan Scaffolding. https://dspace.uii.ac.id/handle/123456789/23039

Sudjianto, A. T., Aditya, C., & Irawan, D. (2024). ANALISIS PERBANDINGAN DESAIN PONDASI BORE PILE DAN SPUN BIAYA PADA PEMBANGUNAN JEMBATAN TOL ( Studi Kasus Pada Jembatan Tol Pandaan-Malang STA . 0 + 225 Akses Interchange Lawang ). 4(2). https://jurnal.widyagama.ac.id/index.php/bouwplank/article/view/450

Ummah, et al. (2023). Analisis Perbandingan Biaya Dan Waktu Penggunaan Scaffolding Dengan Perth Construction Hire (PCH). Prosiding Seminar Nasional Teknik Sipil 2023, ISSN: 2459-9727, 567–572. https://proceedings.ums.ac.id/sipil/article/view/2763




DOI: http://dx.doi.org/10.30811/portal.v17i2.7719

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Lutfi zukhruf, Siti Nurasiyah, Naufal Ariq Pratama