Analisis Penerapan Manajemen Risiko dalam Pelaksanaan Pembangunan Proyek Konstruksi Gedung High-Rise Building (RSIA) Stella Maris

Muhammad Bagus, Fredy Kurniawan

Abstract


In the implementation of construction projects, particularly high-rise building construction, PMBOK provides guidelines for project risk management, covering risk planning, identification, qualitative and quantitative analysis, response planning, response implementation, and risk monitoring. As the scale of a project increases, so does the potential for emerging risks. If these risks are not properly managed, they can impede project progress and cause material losses. The research method used is a survey with the distribution of questionnaires, aiming to identify risk factors and their impacts on stakeholders in the construction of the 10-story RSIA Stella Maris building in Medan. To classify the risks, the Severity Index method was applied based on respondent answers. This study aims to identify risks encountered during the construction phase of the building, analyze the assessment results of identified risks, and map out the responses taken to address these risks. The data analysis results show that there are 27 risk variables, including 4 force majeure risks, 5 design and technology-related risks, 3 contractual risks, 5 material and equipment risks, 3 labor risks, 3 managerial risks, and 9 environmental risks. Referring to the probability and impact values of the 21 identified risk variables, 11 risk categories are avoided (risk avoidance), 8 categories are transferred (risk transfer), and 1 category is reduced (risk reduction). The conclusion of the RSIA Stella Maris high-rise building project implementation shows that the application of risk management in accordance with ISO 31000-2018 has only reached 85%, as the project management and implementation teams have not fully implemented the risk management process.

Keywords


ISO 31000:2018, Risk, Severity Index, Risk Response

References


Adonis, M. R., & Silintowe, Y. B. R. (2021). Desain Produk, Kualitas Produk, Citra Merek dan Harga Produk terhadap Keputusan Pembelian Generasi Y. JURNAL CAPITAL : Kebijakan Ekonomi, Manajemen Dan Akuntansi, 3(1), 118–138. https://doi.org/10.33747/capital.v3i1.80

BSN. (2011). Manajemen risiko — prinsip dan pedoman risk management — principles and guidelines ISO 31000:2011. BSN.

BSN. (2016). Manajemen risiko – Teknik penilaian risiko Risk management – Risk assessment techniques (IEC/ISO 31010:2009, IDT). In SNI. Badan Litbang Kementerian PUPR.

Gunawan, J., Surono, W., & Andi. (2015). Identifikasi Dan Alokasi Risiko-Risiko Pada Proyek Superblok Di Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 4(2), 1–8. https://publication.petra.ac.id/index.php/teknik-sipil/article/view/3904

Institute, P. M. (2013). A Guide to the project management body of knowledge (PMBOK guide). In Project Management Institute,Inc (Fifth Edit). Project Management Institute,Inc. https://doi.org/10.5860/choice.34-1636

ISO 31000:2018. (2018). BS ISO 31000:2018 Risk management-guidelines. In BSI (second). BSI Standards Publication. www.iso.org

Labombang, M. (2011). Manajemen Risiko dalam Proyek Konstruksi di Indonesia. Jurnal Smartek, 9(1), 39–46. https://media.neliti.com/media/publications/221524-manajemen-risiko-dalam-proyek-konstruksi.pdf

Marques, O. P. ., Salain, M. A. K., & Yansen, I. . (2014). Manajemen Risiko Pada Pelaksanaan Proyek Konstruksi Gedung Pemerintah Di Kota Dili – Timor Leste. Jurnal Spektran, 2(2). https://doi.org/https://doi.org/10.24843/SPEKTRAN.2014.v02.i02.p01

Meylani, R. (2018). Analisa Risiko Konstruksi pada Proyek Pembangunan Gedung (Studi Kasus: Proyek Pembangunan Rumah Susun Medan) [universitas sumatera utara]. https://repositori.usu.ac.id/handle/123456789/10068

Nata, I. G. T. S., Putera, I. G. A. A., & Diputra, G. A. (2016). Analisis Risiko Pembangunan Underpass Dewa Ruci. Jurnal Spektran, 4(1), 79–87. https://doi.org/https://doi.org/10.24843/SPEKTRAN.2016.v04.i01.p08

Nugroho, H. P., & Purwanto, E. (2024). Analisis Manajemen Risiko Keselamatan Dan Kesehatan Kerja Pada Proyek Pembangungan Jembatan Berdasarkan ISO 31000:2018. Jurnal Sains Student Research, 2(5), 194–206. https://doi.org/https://doi.org/10.61722/jssr.v2i5.2632

Putera, I. G. A. A., Harmayani, K. D., & Putra, i gede indrajaya. (2019). Manajemen Risiko Pelaksanaan Pembangunan Sistem Pengolahan Air Limbah Terpusat Kota Denpasar Tahap II (Jaringan Air Limbah Pedungan). Jurnal Spektran, 7(1), 42–50. https://ojs.unud.ac.id/index.php/jsn/article/view/47468

Ricardo, J., Manurung, E. H., & Hutagaol, K. (2022). Analisis Risiko Konstruksi pada Proyek Pembangunan Rumah Susun Padat Karya Jakarta Utara. Formosa Journal of Science and Technology, 1(4), 375–392. https://doi.org/https://doi.org/10.55927/fjst.v1i4.1049

Robin, I. (2018). Analisis manajemen risiko berbasis ISO 31000 pada aspek operasional perusahaan (studi kasus di Industri Kafe Kabupaten Sleman, DIY) [Universitas Sanata Dharma]. https://repository.usd.ac.id/30917/

Safitri, N., & Widowati, E. (2017). Penerapan Risk Management pada Pekerjaan di Ketinggian Berdasar SNI ISO 31000:2011. Jurnal Higeia, 1(2). https://journal.unnes.ac.id/sju/higeia/article/view/14005/7770

Sandyavitri, A. (2008). Analisa Resiko Pembangunan Proyek Konstruksi Di Pedesaan (Studi Kasus: Pembangunan Infrastruktur Air Bersih Dan Transportasi). Seminar Nasional Teknik Kimia Oleo & Petrokimia Indonesia, December, 1–15.

Saputri, A. (2019). Identifikasi dan Analisa Risiko Konstruksi Pada Proyek Pembangunan Gedung Fakultas Kedokteran Universitas Muhammadiyah Prof.Dr.Hamka [Universitas islam riau]. https://repository.uir.ac.id/9273/1/153110057.pdf

Soeharto, I. (1999). Manajemen Proyek (kedua). Penerbit Erlangga.

Suseno, Y. H., Wibowo, M. A., & Setiadji, B. H. (2015). Risk analysis of BOT scheme on post-construction toll road. Procedia Engineering, 125, 117–123. https://doi.org/10.1016/j.proeng.2015.11.018

Susilo, L. J., & Kaho, V. R. (2019). Manajemen Risiko : Panduan untuk Risk Leaders dan Risk Practitioners. Grasindo.

Yuliana, C. (2017). Manajemen Risiko Kontrak Untuk Proyek Konstruksi. Rekayasa Sipil, 11(1), 9–16. https://doi.org/10.21776/ub.rekayasasipil.2017.011.01.2

Zhi, H. (1995). Risk management for overseas construction projects. International Journal of Project Management, 13(4), 231–237. https://doi.org/10.1016/0263-7863(95)00015-I

Zulfa, I. M. (2017). Analisis Risiko K3 Menggunakan Pendekatan Hiradc Dan Jsa (Studi Kasus: Proyek Pembangunan Menara Bni Di Jakarta) [universitas brawijaya]. https://download.garuda.kemdikbud.go.id/article.php?article=630678&val=6475&title=analisis risiko k3 menggunakan pendekatan hiradc dan jsa studi kasus proyek pembangunan menara bni di jakarta




DOI: http://dx.doi.org/10.30811/portal.v17i1.6577

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Muhammad Bagus, fredy kurniawan