Studi Perbandingan Penggunaan Software Tekla dan Konvensional dalam Perhitungan Bar Bending Schedule pada Proyek Kantor Inkasa Kertajaya
Abstract
In the construction sector, there is the term BIM, which stands for Building Information Modeling. BIM is a system that forms a process in conveying information or digital references for more accurate physical and functional characteristics about a construction which includes AEC (Architecture, Engineering, and Construction). BIM includes sharing information related to a project/building, from the beginning of planning (pre-construction), implementation (construction), maintenance (maintenance) to demolition (demolition) of the building. The dimensional approach to BIM is known to have advantages, in contrast to conventional applications which are generally still limited to the 3D stage. It is known that BIM can be utilized up to the concepts of 4D (scheduling), 5D (estimating), 6D (sustainability), and 7D (facility management applications) approaches.
In this final assignment proposal, we will discuss the use of the Building Information Modeling (BIM) concept by creating 3D modeling of structural work using Tekla Student Version software in working on bar bending schedules. Tekla software can produce iron calculations on beams and columns assisted by Microsoft Excel software. The calculation results from Tekla will be compared with conventional methods, comparisons will also be made regarding processing time, calculations, cost estimates and material waste in beam & column reinforcing steel.
It is hoped that this can provide an illustration that using computer software is more effective, efficient and can minimize material waste. So research is needed in implementing the BIM concept to see the differences in results between software and (conventional) project data. The building used as the research object is the Inkasa Office Project Construction, Kertajaya Office which is located in the city of Surabaya, East Java, has 5 floors + 1 roof, a land area of 33m long, 27m wide and a building area of 468m2. The function of the building is as an office.
Keywords
Full Text:
PDF (Bahasa Indonesia)References
Apriansyah, R. (2021). Implementasi konsep Building Information Modelling (BIM) dalam estimasi quantity take off material pekerjaan struktural. Universitas Islam Indonesia.
Arystianto, P. D., & Kurniawan, A. M. (2021). Pengaruh pemanfaatan aplikasi Building Informasi Modelling (BIM) Tekla Structure Educational terhadap pembuatan shop drawing dan bill of material. PROKONS: Jurnal Teknik Sipil, 50-58.
Azizah, Ronim. (2022). Integrasi BIM dan Blockchain pada kinerja perancangan AEC (Architecture, Engineering, & Construction). ISSN: 1411-8912. http://siar.ums.ac.id/.
Baskoro, I. A. (2019). Penerapan building information modeling menggunakan Tekla Structures dalam perhitungan volume besi tulangan dan bar bending schedule. PT. Wijaya Karya Bangunan Gedung Tbk.
Dananjaya, H. M. (2020). Aplikasi Building Information Modeling (BIM) pada gedung Asrama Universitas Islam Indonesia Internasional (UIII). Universitas Pertamina
Diputra, G. A., Wiranata, A. A., & Ariel, K. (2023). Perbandingan Bill Of Quantity (BOQ) antara dokumen kontrak dengan hasil perhitungan Tekla Structures (Studi Kasus: Proyek gedung mall di Pulau Jawa). Jurnal Spektran, 55-61.
Dwi, K., Taofiq, & Tugino. (2021). Penerapan SNI 2847:2019 dalam perhitungan kuantitas pekerjaan kait tulangan. Prosiding Seminar Proposal Nasional Riset Teknologi Terapan, e-ISSN:2747-1217
Fadhil, M, & Muhammad. (2022). Aplikasi Building Information Modeling (BIM) menggunakan software Tekla Structures 2022 dalam pembuatan bar bending schedule. Universitas Andalan Padang.
Gunawan, M., & Kartika, N., (2021). Penerapan Building Information Modelling (Bim) pada Proyek Pasar Soreang Kabupaten Bandung. Jurnal Student Teknik Sipil.
Hartono, W., Arniati, A. N., & Sunarmasto. (2015). Rancangan program pengerjaan bar bending schedule penulangan tangga dengan Visual Basic 6.0. e-Jurnal Matriks Teknik Sipil, 412-418.
Hatmoko J, Wibowo M 2020. Edukasi Building Information Modeling (BIM) pada kontraktor kecil. Jurnal Pasopati.
Itsnani, Lucky. (2021). Perencanaan hotel 7 lantai berbasis Metode Building Information Modelling menggunakan Software Tekla Structures dan Tekla Structural Designer. Universitas 17 Agustus 1945 Surabaya
Mafrul, Afridel. (2021). Analisis penjadwalan dan bar bending schedule dengan Building Information Modeling (BIM) Allplan. Universitas Muhammadiyah Sumatera Utara, Medan.
Minawati, R., Chandra, H. P., & Nugraha, P. (2017)., Manfaat penggunaan software Tekla Building Information Modeling (BIM) pada proyek design – build. Dimensi Utama Teknik Sipil, Vol. 4 No. 2, pp. 8–15.
Nandyanto, Y. U., Beatrix, M., & Triana, M. I. (2023). Analysis quality control in project development warehouse PT Santos Jaya Abadi using the Process Decision Program Chart Method. Formosa Journal of Science and Technology, 2(5), 1315–1330. https://doi.org/10.55927/fjst.v2i5.4079
Nobel, A. (2021). Contoh gambar tabel pembesian balok. https://blog.nobelconsultant.com/contoh-gambar-tabel-pembesian-balok/
Nova, S. A. W. (2020). Evaluasi perhitungan material dan biaya besi pada Proyek Rumah Dinas Polres Kota Sukabumi. Jurnal Student Teknik Sipil, 2(1).
Permana, I. (2021). Optimasi kebutuhan tulangan pada balok menggunakan program linier metode simplex dan Building Information Modeling (BIM). Universitas Islam Indonesia.
Peraturan Kementrian Pekerjaan Umum dan Perumahan Rakyat (PUPR), Nomor 22. (2018). Pedoman Pembangunan Bangunan Gedung Negara.
Peraturan Kementrian Pekerjaan Umum dan Perumahan Rakyat (PUPR). (2018). Pelatihan perencanaan kontruksi dengan sistem teknologi BIM. Modul 5.
Purwanto, E. Wibowo, & Ahmad, Y. W. (2020). Pengaplikasian Building Information Modeling (BIM) dalam rancangan Pembangunan Gedung Induk Universitas Aisyiyah Kartasura. Jurnal Matriks Tekik Sipil, Vol 8, No. 4.
Setiawan, J., Sutriono, I., & Rochmah, N. (2022). Analisis produktivitas tenaga kerja terhadap pekerjaan pembesian kolom dan balok pada Proyek Vasa Hotel Extension (Vol. 5).
Sinipat, Lintang. (2023). Analisa kebutuhan material besi tulangan pada struktur beton bertulang dengan metode bar bending schedule pada Proyek Pembangunan Sekolah Cita Hati Surabaya. Jurnal Taguchi, Vol. 3 No.1
DOI: http://dx.doi.org/10.30811/portal.v16i1.4834
Refbacks
- There are currently no refbacks.
Copyright (c) 2024 Mohamad Adi Prasetia